Ingenierías USBMed
Dimensions

PlumX

How to Cite
Cuervo, I. N. (2019). Ituango Hydroelectric Power Plant: A Case for the Environmental Analysis of the Territory. Ingenierías USBmed, 10(2), 44–54. https://doi.org/10.21500/20275846.4139
License terms

This journal provides immediately free access to its contents under the principle that make available the research results for free to the public, helps for a greater global exchange of knowledge.

Therefore, the journal invokes the Creative Commons 4.0

License attributions: Recognition – Non-commertial - Share equal. Commercial use and distribution of original or derivative works are not permitted and must be done with a equal license as the one that regulate the original work.

Abstract

Based on the research, "Local development factors in a habitat affected by hydroelectric development projects: Ituango Hydroelectric Project, Antioquia, Colombia", developed by the author between the years 2015 and 2018, this article raises a Complex reading of habitats affected by hydroelectric projects. From a view of the scales, institutions and social construction of the habitat, it elaborates an overview of the development conditions promoted by the megaprojects, where some of the inconsistencies of methodological type are identified that are presented during the process of planning and execution of the projects. From this exercise are proposed some axes of analysis, the objective of this, is to locate the local development within the normative frameworks, as the same methodologies used by the hydroelectric projects once intervene in the territories. These axes of analysis define orientations for the comprehension of affected habitats and as a route of attention to other problems that confront the local communities and administrations when large development projects are implemented in Colombia and the world.

Keywords:

References

[1] I. N. Cuervo López, Factores de desarrollo local en un hábitat afectado por proyectos de desarrollo hidroeléctrico: proyecto Hidroeléctrico Ituango, Antioquia, Colombia. Medellín: Universidad Nacional de Colombia, 2018.
[2] C. H. Medina, A. B. Hernández, and M. C. Fuentes, “Evaluación de sostenibilidad en proyectos de desarrollo,” Ing. USBMed, vol. 10, no. 1, 2019.
[3] World Energy Council, “Hydropower,” Energy resources, 2016. [Online]. Disponible en: https://www.worldenergy.org/data/resources/resource/hydropower/. [Último acceso: 20-Sep-2003].
[4] F. Ortúzar, “Desmantelando el mito de las grandes represas tomado,” AIDA, 2014. [Online]. Disponible en: http://www.aida-americas.org/es/blog/desmantelando-el-mito-de-las-grandes-represas.
[5] Ministerio de Ambiente Vivienda y Desarrollo Territorial, “Metodología general para la presentación de estudios ambientales,” Bogotá, 2010.
[6] J. A. Polanco López, “La Responsabilidad Social Del Grupo Epm: Una Nueva Postura Política Frente Al Territorio.,” Gr. EPM Soc. Responsib. A new Polit. stance against Territ., vol. 27, no. 49, pp. 65–85, 2014.
[7] ANLA, “Terminos de referencia para la elaboración del estudio de impacto ambiental-EIA en proyectos de construcción y operación de centrales generadores de energía hidroeléctrica,” Bogotá, 2017.
[8] Hidroeléctrica Ituango, “Manual de Valores Unitarios. Avaló de predios y mejoras,” Bogotá, 2010.
[9] G. D. Valencia A., C. A. Vasco, G. D. V. A, and C. A. V. C, “La interconexión eléctrica de las Américas,” Perf. Coyunt. Económica, no. 19, pp. 93–111, 2012.
[10] Hidroeléctrica Ituango, “Proyecto hidroeléctrico Ituango, Una contribución al desarrollo local y regional Un mejor futuro para los colombianos”, 2016. [Online]. Disponible en: http://www.hidroituango.com.co/proyectos/proyecto-hidroelectrico-ituango/38. [Último acceso: 01-Oct-2017].
[11] E. Villamizar, “Hidroeléctrica Ituango, Resultados del análisis causa raíz”, 2018. [Online]. Disponible en: https://www.hidroituango.com.co/articulo/cumpliendo-con-el-compromiso-de-informar-a-la-opinion-publica-y-en-un-ejercicio-de-transparencia-epm-compartio-los-resultados-del-analisis-causa-raiz-fisica-que-dio-origen-a-la-contingencia-en-el-proyecto-hidroelectrico-ituango/495. [Último acceso: 05-Mar-2018].
[12] Semana Sostenible, “Histórico: declaran al río Cauca como sujeto de derechos,” Revista Semana, 20 de junio de 2019.
[13] P. McCully, Ríos silenciados. Ecología y politica de las grandes presas. Argentina: Proteger – Amigos de la Tierra, 2004.
[14] B. Chellaney, “The power of water,” en Water, peace, and war: confronting the global water crises. Londres y Nueva York: Rowman & Littlefiel, 2013, pp. 59–119.
[15] C. A. S. Montero and A. M. C. Salcedo Forero, “Expansión hidroeléctrica, Estado y economías campesinas: El caso de la represa del Quimbo, Huila-Colombia,” Mundo Agrar., vol. 16, no. 31, 2015.
[16] T. Roa and B. Duarte, “Desarrollo hidroeléctrico, despojo y transformacion territorial: el caso de Hidrosoamoso, Santander, Colombia,” en Aguas Robdas. Despojo Hídrico y Movilización Social., A. Arroyo and R. Boelens, Eds. Quito: Abya-Yala, 2013, pp. 1–43.
[17] S. E. Hoyos-Gómez and R. Bernal, “Rheophytes of the Samaná Norte River, Colombia: A Hydroelectric Project Threatens an Endemic Flora,” Trop. Conserv. Sci., vol. 11, pp. 11-13, 2018.
[18] Congreso de la República de Colombia. Decreto 2811 de 1974. Colombia, 1974.
[19] H. Romero Toledo, “Ecología política y represas: elementos para el análisis del Proyecto Hidroaysén en la Patagonia chilena,” Scielo, vol. 175, pp. 161–175, 2014.
[20] Contraloría General de la República, “Informe auditoría de cumplimiento gestión de las autoridades ambientales en el proceso de licenciamiento - Proyecto Hidroeléctrico Ituango,” Bogotá, 2018.
[21] Corporación interaméricana de Inversiones (CII), “Resumen de revisión social y ambiental (ESRS, por sus siglas en inglés), Proyecto Hidroeléctrico Ituango,” 2016.

Downloads

Download data is not yet available.

Cited by